5. Relocation Services |
|
Planning
- Assignment of a IT Services Manager
- Dates & timeframes established
- Manpower & activity coordination
- Collection of preliminary data
|
|
Evaluation of Infrastructure and Equipment at Existing Facility
- Telephone System
- Does system need to be replaced? Why?
- What is the capacity of the existing system versus the growth needs of the company?
- What is the feature set of the existing system versus the needs of the company?
- Is there additional equipment required for the existing system to work at the new facility?
- Should the company consider replacement of telephone system at this time since they will already be installing at the new location and there is a cost savings in performing a replacement in conjunction with the move. It also allows for having both systems running at the same time which reduces the time between breakdown and reinstallation.
- Network Equipment - Server(s), Networking Equipment, Printers/Scanners/Faxes/Copiers, Workstations, Laptops
- Should the company consider replacement of any NETWORK EQUIPMENT at this time since they will already be installing at the new location and there is a cost savings in performing a replacement in conjunction with the move. It also allows for having both pieces of equipment running at the same time which reduces the time between breakdown and reinstallation.
|
|
Evaluation of New Facility
- Power requirements - Ensuring that the power is either in place or coordinating with the electrical contractor to have the proper power installed. Typically dedicated power circuits are recommended for the data Center.
- AC and ventilation requirements - Ensuring that the AC and/or ventilation requirements are either in place or coordinating with the HVAC contractor to have the proper ventilation and or separate AC unit installed.
- Network infrastructure requirements - Designing the necessary changes that will be implemented at the new facility. Includes; cabling, power, racks, and decision on new/replacement equipment.
- Equipment positioning requirements
- Communications
- Evaluation of Data and Voice needs
- Selection of carriers and services
- Scheduling of service installation
- Testing of services prior to move
|
|
Breakdown of Existing Equipment
- IT Consultant(s) Onsite
- Equipment & cables labeled - Equipment includes; Server(s), Networking Equipment, Printers/Scanners/Faxes/Copiers, Workstations, Laptops, Phone System, and Phones.
- All equipment documented
- Equipment secured for transport
|
|
Transportation
- Depending on the amount of equipment and the distance of the move, a Bonded Professional Mover may be selected
- Supervision of loading and unloading
|
|
Installation of Systems at New Facility
- IT Consultant(s) Onsite
- Equipment positioning and installation
- Testing of Server(s), Networking Equipment, Printers/Scanners/Faxes/Copiers,Workstations, Laptops, Phone System, and Phones
- IT Consultant(s) Onsite on Go Live day(s) to assist users with any issues
|
|

| |
|
|
|
|