5. Relocation Services
Planning
  • Assignment of a IT Services Manager
  • Dates & timeframes established
  • Manpower & activity coordination
  • Collection of preliminary data

    Evaluation of Infrastructure and Equipment at Existing Facility

    • Telephone System
      • Does system need to be replaced? Why?
        • What is the capacity of the existing system versus the growth needs of the company?
        • What is the feature set of the existing system versus the needs of the company?
        • Is there additional equipment required for the existing system to work at the new facility?
      • Should the company consider replacement of telephone system at this time since they will already be installing at the new location and there is a cost savings in performing a replacement in conjunction with the move. It also allows for having both systems running at the same time which reduces the time between breakdown and reinstallation.
    • Network Equipment - Server(s), Networking Equipment, Printers/Scanners/Faxes/Copiers, Workstations, Laptops
      • Should the company consider replacement of any NETWORK EQUIPMENT at this time since they will already be installing at the new location and there is a cost savings in performing a replacement in conjunction with the move. It also allows for having both pieces of equipment running at the same time which reduces the time between breakdown and reinstallation.
    Evaluation of New Facility
    • Power requirements - Ensuring that the power is either in place or coordinating with the electrical contractor to have the proper power installed. Typically dedicated power circuits are recommended for the data Center.
    • AC and ventilation requirements - Ensuring that the AC and/or ventilation requirements are either in place or coordinating with the HVAC contractor to have the proper ventilation and or separate AC unit installed.
    • Network infrastructure requirements - Designing the necessary changes that will be implemented at the new facility. Includes; cabling, power, racks, and decision on new/replacement equipment.
    • Equipment positioning requirements
    • Communications
    • Evaluation of Data and Voice needs
      • Selection of carriers and services
      • Scheduling of service installation
      • Testing of services prior to move
    Breakdown of Existing Equipment
    • IT Consultant(s) Onsite
    • Equipment & cables labeled - Equipment includes; Server(s), Networking Equipment, Printers/Scanners/Faxes/Copiers, Workstations, Laptops, Phone System, and Phones.
    • All equipment documented
    • Equipment secured for transport
    Transportation
    • Depending on the amount of equipment and the distance of the move, a Bonded Professional Mover may be selected
    • Supervision of loading and unloading
    Installation of Systems at New Facility
    • IT Consultant(s) Onsite
    • Equipment positioning and installation
    • Testing of Server(s), Networking Equipment, Printers/Scanners/Faxes/Copiers,Workstations, Laptops, Phone System, and Phones
    • IT Consultant(s) Onsite on Go Live day(s) to assist users with any issues
       